GSYS were contracted to design and supply a fully modularised Control Room, ICSS System, Normal and Essential Power Distribution and UPS Local Equipment Rooms to a floating production barge and fixed well head platform based offshore near Cambodia. The project included:
The solution was based on dual redundant s7-400H processors with ET200SP HA IO for Process Control and dual redundant s7-400F/H processors with ET200M IO for Safety and Fire and Gas detection. Communication to the wellhead platform located 150m from the production barge used an enterprise wireless solution with dual connections and low latency.
GSYS also provided technical consultancy services to the incumbent field design supplier on the production barge operating in a multi-national team. GSYS was further awarded the field design engineering contract for the well head system.
GSYS personnel were on hand both in the shipyard in Singapore during build and offshore during commissioning to ensure smooth start-up.